How early is early enough?
Before the openings are framed, if you can. Headroom, side room, backroom, and where the operator lands are structural questions, and after drywall they stop being choices and start being constraints — high-lift track, a jackshaft operator, or a shorter door all get forced on you at that point. The plans are enough to have the conversation. You do not need the site.